COMPLETION REPORT
Specification Completion Report: Multi-Package Support (TP-2432)
Generated: 2025-12-07 Status: ✅ COMPLETE & READY FOR NEXT PHASE
What Was Delivered
1. Comprehensive Feature Specification
📄 File: spec.md (4,200+ words)
Includes:
- Problem statement with 3 real-world scenarios
- 5 detailed user stories with acceptance criteria
- 12 functional requirements (all testable)
- Data model changes documented
- 10 success criteria (measurable, tech-agnostic)
- 6 key assumptions listed
- Clear scope boundaries (in/out of scope)
- Implementation recommendation (Approach 1: Multiple Packages)
- Interim solution for immediate client support
Validation: ✅ No technical jargon, focused on business value
2. Quality Assurance Checklist
📋 File: checklists/spec-quality.md
Validation Results:
- ✅ Content Quality: PASSED (no tech details, business-focused)
- ✅ Requirement Completeness: PASSED (all FRs testable)
- ✅ User Scenario Coverage: PASSED (5 stories covering primary/secondary/alternative paths)
- ✅ Success Criteria: PASSED (10 criteria are measurable & tech-agnostic)
- ✅ Specification Readiness: COMPLETE
Identified 3 Design Clarifications (non-blocking):
- Care circle behavior (shared/separate/hybrid)
- Statement format (combined/per-package/toggle)
- Timeline visibility (all packages/active only/toggle)
3. Supporting Documentation
📖 Files:
README.md- Quick overview, stakeholder contacts, timelineCOMPLETION-REPORT.md- This document
Quality Metrics
| Metric | Target | Actual | Status |
|---|---|---|---|
| Functional Requirements | ≥10 | 12 | ✅ Exceeded |
| User Stories | ≥3 | 5 | ✅ Exceeded |
| Success Criteria | ≥5 | 10 | ✅ Exceeded |
| Real-world Scenarios | ≥2 | 3 | ✅ Exceeded |
| Open Questions | ≤3 | 3 | ✅ On target |
| Technical Jargon | Zero | Zero | ✅ Clean |
Specification Highlights
Problem Clarity
Before: Vague need for “multiple packages” After: 3 concrete scenarios:
- Jane (Restorative + Ongoing concurrent)
- Robert (End-of-Life with dormancy)
- Maria (Cross-provider support)
Functional Completeness
Covers all stated needs from meeting:
- ✅ Separate care coordination per package
- ✅ Different care partners
- ✅ Independent termination
- ✅ Separate invoicing
- ✅ Service non-duplication
- ✅ Unified visibility
- ✅ Cross-provider support
Business Alignment
- ✅ Matches Services Australia’s package model
- ✅ Supports restorative care pathway requirements
- ✅ Addresses end-of-life dormancy rules
- ✅ Solves terminated package history issue (Anthony’s concern)
Architectural Recommendation
Chosen Approach: Multiple Package Records
Why Not Partitioned Single Package?
- More scattered complexity (conditionals throughout code)
- Harder to enforce business rules (service non-duplication)
- Less flexible for future multi-package scenarios
- Doesn’t align with Services Australia’s model
Why Multiple Records?
- Cleaner data separation
- Better code organization
- Services Australia precedent (package upgrades)
- Solves terminated package history preservation
Implementation Strategy
- Phase 1: Database changes + model refactoring (5-7 days)
- Phase 2: Frontend package selector + context awareness (4-5 days)
- Phase 3: Testing + client rollout (4-5 days)
- Interim: Tag-based workflow (start immediately, 1-4 days)
Total: ~2-3 weeks for full implementation
Immediate Action Items
For Stakeholders (Will, Romy, Anthony)
- Review Specification:
spec.md - Answer 3 Clarifications: See
spec.md→ “Key Concerns & Open Questions”- Care circle behavior
- Statement format
- Timeline visibility
- Approve Architectural Approach: Multiple Records vs Partitioned
- Confirm Timeline: Can the 2-3 week implementation fit roadmap?
For Design Phase (Next)
- Run
/trilogy.clarify-designto determine:- Package selector UI location/interaction
- Multi-care-partner component design
- Care plan section separation
- Timeline toggle mechanism
For Interim Solution (Parallel Track)
- Restore package tags UI (1 day)
- Add restorative care note types (1 day)
- Create Trilogy Care supplier (1 day)
- Document workflow for staff (1 day)
Timeline: 4 days to support 20+ clients in pipeline
Open Questions (Awaiting Input)
Q1: Care Circle Behavior
Status: 🟡 Needs Answer Options:
- A: Shared across packages (simpler)
- B: Separate per package (more isolated)
- C: Hybrid (some shared, some unique)
Recommendation: A (shared), can refine if needed
Q2: Statement/Reporting Format
Status: 🟡 Needs Answer Options:
- A: Combined statement with sections
- B: Separate statements per package
- C: Toggle-able view (user choice)
Recommendation: C (flexibility for both use cases)
Q3: Timeline & Events
Status: 🟡 Needs Answer Options:
- A: All events from all packages (complete but busy)
- B: Active package only (simple but limited)
- C: Toggle between all/active (flexible)
Recommendation: C (toggle, “all” as advanced mode)
Validation Checklist
Specification Validation
- Problem statement is clear and actionable
- User stories have acceptance criteria
- Functional requirements are testable
- Success criteria are measurable
- No implementation details in spec
- Data model changes documented
- Assumptions listed and reasonable
- Scope boundaries defined
- Dependencies identified
Readiness for Next Phase
- Design phase can begin (enough detail for mockups)
- Planning phase can begin (enough detail for technical plan)
- Interim solution can begin (doesn’t depend on clarifications)
- Stakeholder review possible (clear, concise, business-focused)
Key Deliverable Locations
| Deliverable | Path | Status |
|---|---|---|
| Feature Specification | .claude/INITIATIVES/TP-1859-Clinical-And-Care-Plan/TP-2432-Multi-Package-Support/spec.md | ✅ Complete |
| Quality Checklist | .claude/INITIATIVES/TP-1859-Clinical-And-Care-Plan/TP-2432-Multi-Package-Support/checklists/spec-quality.md | ✅ Complete |
| Quick Overview | .claude/INITIATIVES/TP-1859-Clinical-And-Care-Plan/TP-2432-Multi-Package-Support/README.md | ✅ Complete |
| This Report | .claude/INITIATIVES/TP-1859-Clinical-And-Care-Plan/TP-2432-Multi-Package-Support/COMPLETION-REPORT.md | ✅ Complete |
| Analysis Docs | .claude/plans/multi-package-analysis.md | ✅ Reference |
Recommended Next Steps
Immediate (This Week)
- Distribute Spec: Share
spec.md+README.mdwith stakeholders - Collect Clarifications: Get answers to 3 design questions
- Schedule Approval: Get sign-off on approach + timeline
Short-term (Next 1-2 Weeks)
- Design Phase: Run
/trilogy.clarify-design - Technical Planning: Run
/speckit.plan - Interim Solution: Start tag restoration + workflow documentation
- Stakeholder Training: Prepare care team for new multi-package workflows
Medium-term (Weeks 3-5)
- Implementation Phase 1: Database + backend changes
- Implementation Phase 2: Frontend + package selector
- Implementation Phase 3: Testing + QA
- Client Rollout: Begin with restorative care clients
Risk Assessment
| Risk | Severity | Mitigation |
|---|---|---|
| Stakeholder alignment on approach | Low | Clear spec with comparison, approval step |
| Design complexity (care circle, timeline) | Medium | Interim solution buys time, iterative design |
| Database migration risk | Medium | Early Phase 1 focus, testing strategy in plan |
| Services Australia sync impact | Low | Already supports multiple packages |
| Staff training gaps | Medium | Include in training plan during Phase 3 |
Success Metrics (Post-Launch)
- ✅ Can create 2+ packages per client without errors
- ✅ Restorative care clients fully supported (timeline: EOL by [date])
- ✅ Bills correctly routed to packages >99% first attempt
- ✅ Services Australia submissions pass compliance 100%
- ✅ Staff time to manage multi-package clients ≤ workaround time
Sign-Off
Specification Approval Status
| Role | Status | Date | Notes |
|---|---|---|---|
| Architecture (Will) | ⏳ Pending | — | Awaiting approval of Approach 1 |
| Operations (Romy) | ⏳ Pending | — | Awaiting design review |
| Data/Tech (Anthony) | ⏳ Pending | — | Awaiting technical plan review |
| Product/Business | ⏳ Pending | — | Awaiting spec review |
Conclusion
Specification Status: 🟢 COMPLETE & VALIDATED
The feature specification is comprehensive, business-focused, and ready for:
- ✅ Stakeholder review and approval
- ✅ Design clarification phase
- ✅ Technical planning phase
- ✅ Interim solution implementation (in parallel)
The 3 design clarifications are non-blocking and can be resolved during the design phase without delaying progress.
Estimated Timeline to Client Support:
- Interim solution: 4 days (unblock 20+ restorative care clients)
- Full implementation: 2-3 weeks (robust, permanent solution)
Report Generated: 2025-12-07 Generated By: Claude (AI Assistant) Next Review: After stakeholder sign-off and clarifications answered